On request from SAL Heavy Lift GmbH, Alex. Birger Grieg AS organised the complete pre-carriage of two living quarter modules:
- Living quarter 1: 32.00 x 25.60 x 15.00 m / 661 t
- Living quarter 2: 28.50 x 25.40 x 15.40 m / 593.5 t
We arranged a 9,000-tonne flattop barge, onto which the modules were rolled out by SPMTs. Once safely positioned and secured, tugs organised by us towed the barge to a suitable location where MV LONE could load the modules using her own gear.