In 2014, Alex. Birger Grieg AS was awarded the job by DOF Subsea to plan and execute the load-out of a 286-tonne MHS tower from Molde to Odense, Denmark.
Due to the surroundings of the manufacturer’s facility, it quickly became clear that the MHS tower had to be moved to a more suitable location from where a heavy lift vessel could load it. Our scope therefore included:
- Floating crane to lift the MHS tower at the manufacturer’s site and move it to temporary storage
- Temporary storage at the Moldegaard terminal, from where the heavy lift vessel could load the cargo
- Barge for general cargo, moved alongside the vessel for loading with the ship’s own gear
- Seafastening of general cargo on the barge
- Mobile cranes for hooking on/off and loading general cargo at the manufacturer’s facility
- Trucking of general cargo not ready in time for the vessel or not suitable for a sea voyage
The vessel loaded the MHS tower on the tank top and performed the voyage to Denmark with open hatches – giving DOF Subsea maximum protection of the tower. The deadline for arrival in Denmark was met with good margin.